Nur Yaqin, H., Teki Tjendani, H. . and Witjaksana , B. . (2023) “Analysis of The Acceleration of Time and Cost of Implementing Building Construction Projects Using The Critical Path Method (CPM) Method”, Devotion : Journal of Research and Community Service, 4(2), pp. 336–346. doi: 10.36418/dev.v4i2.388.