Nur Yaqin, H., Teki Tjendani, H. ., & Witjaksana , B. . (2023). Analysis of The Acceleration of Time and Cost of Implementing Building Construction Projects Using The Critical Path Method (CPM) Method. Devotion : Journal of Research and Community Service, 4(2), 336–346. https://doi.org/10.36418/dev.v4i2.388